ITAC Assessment: MA0796
ITAC logo
ITAC Assessment: MA0796
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 5
Plant Area 40,000
ft2
Annual Production 365,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,736 701,342
kWh
Electricity Demand $26,605 1,442
kW-mo/yr
Electricity Fees $4,766 -
LPG $7,930 365
MMBtu
TOTAL YEARLY COSTS $105,037
RECOMMENDED SAVINGS* $18,470 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,232

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,315 $14,350 $14,928
158,805
kWh
$4,096
-
kW-mo/yr
$(-14,709.0)
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,245 $6,660 $3,758
39,980
kWh
$3,487
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $3,193 $200 $1,846
19,636
kWh
- $1,347
-
MMBtu
04 3.1191: Change procedures / equipment / operating conditions $1,678 $300 $1,678
17,852
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,405 $2,499 $704
7,486
kWh
$701
-
kW-mo/yr
-
06 2.7221: Lower temperature during the winter season and vice-versa $634 $200 $634
6,741
kWh
- -
TOTAL RECOMMENDED $18,470 $24,209 $23,548
250,500
kWh
$8,284
-
kW-mo/yr
$(-13,362.0)
-
MMBtu
TOTAL IMPLEMENTED $5,232 $2,899 $3,184
33,863
kWh
$701
-
kW-mo/yr
$1,347
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs