ITAC Assessment: UU0141
ITAC logo
ITAC Assessment: UU0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Treated Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $5
M
to 10
M
# of Employees 180
Plant Area 250,000
ft2
Annual Production 5,050,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,417,659 38,931,709
kWh
TOTAL YEARLY COSTS $2,417,659
RECOMMENDED SAVINGS* $738,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $330,340

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings
01 3.2161: Closely monitor chemical additions to increase bath life $377,727 $30 - $377,727
02 2.7142: Utilize higher efficiency lamps and/or ballasts $176,898 $256,282 $179,374
2,888,469
kWh
$(-2,476.0)
03 2.2611: Moderate cooling tower outlet temperature $149,664 $22,400 $149,664
2,410,048
kWh
-
04 2.4226: Use / purchase optimum sized compressor $30,073 - $30,073
484,280
kWh
-
05 2.7135: Install occupancy sensors $3,778 $1,225 $3,778
60,831
kWh
-
TOTAL RECOMMENDED $738,140 $279,937 $362,889
5,843,628
kWh
$375,251
TOTAL IMPLEMENTED $330,340 $279,907 $332,816
5,359,348
kWh
$(-2,476.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs