Assessment Year | 2001 |
---|---|
Principal Product | Pressure Sensitive Labels and Plastic Films |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 97 |
Plant Area |
110,184
ft2
|
Annual Production | 14,400
thousand feet
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $75,195 | 1,994,431 |
kWh
|
$0.038 |
Electricity Demand | $58,440 | 4,795 |
kW-mo/yr
|
$12.19 |
Electricity Fees | $9,191 | - |
|
- |
Natural Gas | $64,785 | 12,051 |
MMBtu
|
$5.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $57,868 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.8142: Distill contaminated solvents for reuse | $27,904 | $20,000 | - | - | - |
$12,600
-
gal
|
$(-1,224.0)
-
lb
|
$(-2,530.0) | $19,058 | |
02 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $11,368 | - | - | - | - | - |
$11,368
-
lb
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,197 | $12,760 |
$3,046
77,374
kWh
|
$1,151
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,301 | $2,460 | - | - |
$3,301
-
MMBtu
|
- | - | - | - | |
05 | 2.2621: Modify refrigeration system to operate at a lower pressure | $3,200 | $9,600 |
$2,377
60,375
kWh
|
$823
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.2437: Recover waste heat from equipment | $2,502 | $1,000 | - | - |
$2,502
-
MMBtu
|
- | - | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,586 | $1,280 |
$1,142
29,015
kWh
|
$444
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $478 | $90 |
$355
9,086
kWh
|
$123
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.7243: Improve air circulation with destratification fans / other methods | $1,641 | $3,750 |
$(-462.0)
(-12,016)
kWh
|
- |
$2,103
-
MMBtu
|
- | - | - | - | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,158 | $627 |
$774
19,637
kWh
|
$384
-
kW-mo/yr
|
- | - | - | - | - | |
11 | 2.6218: Turn off equipment when not in use | $533 | - |
$319
8,206
kWh
|
$214
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $57,868 | $51,567 |
$7,551
191,677
kWh
|
$3,139
-
kW-mo/yr
|
$7,906
-
MMBtu
|
$12,600
-
gal
|
$10,144
-
lb
|
$(-2,530.0) | $19,058 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs