ITAC Assessment: OK0954
ITAC logo
ITAC Assessment: OK0954
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product metal gears for motor vehicles
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 422
Plant Area 177,000
ft2
Annual Production 2,300,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,774,359 33,797,320
kWh
Electricity Demand $654,058 63,823
kW-mo/yr
Electricity Fees $50,906 -
Natural Gas $182,191 42,301
MMBtu
TOTAL YEARLY COSTS $2,661,514
RECOMMENDED SAVINGS* $459,029 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $91,251

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8121: Apply for tax-free status for energy purchases $21,845 $105 - - $21,845
02 2.4239: Eliminate or reduce compressed air usage $84,389 $6,066 $60,695
1,156,098
kWh
$23,693
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $235,221 $174,014 $198,738
3,785,488
kWh
$36,483
-
kW-mo/yr
-
04 3.1161: Eliminate/reduce an operation $62,368 $3,640 $49,209
937,320
kWh
$13,158
-
kW-mo/yr
-
05 2.6241: Reduce temperature of process equipment when on standby $6,862 $3,640 $6,862
130,714
kWh
- -
06 2.7224: Reduce space conditioning during non-working hours $48,345 $350 $48,345
920,850
kWh
- -
TOTAL RECOMMENDED $459,029 $187,815 $363,850
6,930,470
kWh
$73,335
-
kW-mo/yr
$21,845
TOTAL IMPLEMENTED $91,251 $9,706 $67,557
1,286,812
kWh
$23,693
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs