ITAC Assessment: CO0699
ITAC logo
ITAC Assessment: CO0699
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Water treatment systems
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 97,500
ft2
Annual Production 2,100
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,291 1,367,520
kWh
Electricity Demand $68,767 3,138
kW-mo/yr
Electricity Fees $630 -
Natural Gas $10,389 1,611
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,690 $290 $1,640
35,300
kWh
$1,050
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,720 $13,660 $2,840
61,100
kWh
$3,640
-
kW-mo/yr
$90 - $150
03 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $5,040 $13,500 $1,010
21,900
kWh
$4,030
-
kW-mo/yr
- - -
04 2.8121: Apply for tax-free status for energy purchases $4,890 $500 - - - $4,890 -
TOTAL RECOMMENDED $19,340 $27,950 $5,490
118,300
kWh
$8,720
-
kW-mo/yr
$90 $4,890 $150
TOTAL IMPLEMENTED $7,580 $790 $1,640
35,300
kWh
$1,050
-
kW-mo/yr
- $4,890 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs