ITAC Assessment: OR0811
ITAC logo
ITAC Assessment: OR0811
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product SDD powder
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 50,000
ft2
Annual Production 580
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $371,220 4,900,200
kWh
Electricity Demand $129,913 9,624
kW-mo/yr
Electricity Fees $642 -
Natural Gas $121,113 13,681
MMBtu
Waste Disposal Costs
Water Usage $29,234 9,750
Tgal
Water Disposal $61,274 10,627
Tgal
TOTAL YEARLY COSTS $713,396
RECOMMENDED SAVINGS* $212,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 4.212: Adopt in-house material generation $165,269 $363,639 $(-12,530.0)
(-165,384)
kWh
$(-3,058.0)
-
kW-mo/yr
$180,857
02 2.4322: Use or replace with energy efficient substitutes $4,192 - $3,369
44,466
kWh
$823
-
kW-mo/yr
-
03 2.9114: Use solar heat to make electricty $42,617 $404,426 $28,188
372,328
kWh
$14,429
-
kW-mo/yr
-
TOTAL RECOMMENDED $212,078 $768,065 $19,027
251,410
kWh
$12,194
-
kW-mo/yr
$180,857
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs