657
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Water supply and irrigation systems | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| TR0015 #07 Y:2019 | 07 | 2019 | Cover containers to minimize evaporative losses | $483,876 | $1,077,133 | |
| TR0015 #06 Y:2019 | 06 | 2019 | Maintain machines to reduce leaks | $1,094 | $844 | |
| TR0015 #05 Y:2019 | 05 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $1,388 | - | |
| TR0015 #04 Y:2019 | 04 | 2019 | Replace existing hvac unit with high efficiency model | $1,095 | $3,250 | |
| TR0015 #03 Y:2019 | 03 | 2019 | Install occupancy sensors | $1,234 | $616 | |
| TR0015 #02 Y:2019 | 02 | 2019 | Utilize higher efficiency lamps and/or ballasts | $2,060 | $1,959 | |
| TR0015 #01 Y:2019 | 01 | 2019 | Utilize higher efficiency lamps and/or ballasts | $1,893 | $2,389 | |
| UU0155 #03 Y:2019 | 03 | 2019 | Enhance sensitivity of temperature control and cutoff | $898 | $1,650 | |
| UU0155 #02 Y:2019 | 02 | 2019 | Redesign flow to minimize mass transfer length | $14,015 | $46,625 | |
| UU0155 #01 Y:2019 | 01 | 2019 | Adopt in-house material generation | $102,278 | $823,000 | |
| UU0153 #07 Y:2019 | 07 | 2019 | Adjust burners for efficient operation | $1,444 | $400 | |
| UU0153 #06 Y:2019 | 06 | 2019 | Replace electrically-operated equipment with fossil fuel equipment | $899 | $2,019 | |
| UU0153 #05 Y:2019 | 05 | 2019 | Purchase gas directly from a contract gas supplier | $2,777 | $6,500 | |
| UU0153 #04 Y:2019 | 04 | 2019 | Insulate bare equipment | $5,443 | $502 | |
| UU0153 #03 Y:2019 | 03 | 2019 | Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $22,776 | $146,977 | |
| UU0153 #02 Y:2019 | 02 | 2019 | Use optimum size and capacity equipment | $14,902 | $205,000 | |
| UU0153 #01 Y:2019 | 01 | 2019 | Use or replace with energy efficient substitutes | $48,728 | $423,632 | |
| NC0633 #05 Y:2019 | 05 | 2019 | Optimize plant power factor | $1,338 | $5,000 | |
| NC0633 #04 Y:2019 | 04 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $6,540 | $10,000 | |
| NC0633 #03 Y:2019 | 03 | 2019 | Reschedule plant operations or reduce load to avoid peaks | $920 | $500 |