Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

657

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Water supply and irrigation systems
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TR0015 #07 Y:2019 Cover containers to minimize evaporative losses $483,876 $1,077,133
TR0015 #06 Y:2019 Maintain machines to reduce leaks $1,094 $844
TR0015 #05 Y:2019 Utilize energy-efficient belts and other improved mechanisms $1,388 -
TR0015 #04 Y:2019 Replace existing hvac unit with high efficiency model $1,095 $3,250
TR0015 #03 Y:2019 Install occupancy sensors $1,234 $616
TR0015 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $2,060 $1,959
TR0015 #01 Y:2019 Utilize higher efficiency lamps and/or ballasts $1,893 $2,389
UU0155 #03 Y:2019 Enhance sensitivity of temperature control and cutoff $898 $1,650
UU0155 #02 Y:2019 Redesign flow to minimize mass transfer length $14,015 $46,625
UU0155 #01 Y:2019 Adopt in-house material generation $102,278 $823,000
UU0153 #07 Y:2019 Adjust burners for efficient operation $1,444 $400
UU0153 #06 Y:2019 Replace electrically-operated equipment with fossil fuel equipment $899 $2,019
UU0153 #05 Y:2019 Purchase gas directly from a contract gas supplier $2,777 $6,500
UU0153 #04 Y:2019 Insulate bare equipment $5,443 $502
UU0153 #03 Y:2019 Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $22,776 $146,977
UU0153 #02 Y:2019 Use optimum size and capacity equipment $14,902 $205,000
UU0153 #01 Y:2019 Use or replace with energy efficient substitutes $48,728 $423,632
NC0633 #05 Y:2019 Optimize plant power factor $1,338 $5,000
NC0633 #04 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $6,540 $10,000
NC0633 #03 Y:2019 Reschedule plant operations or reduce load to avoid peaks $920 $500