ITAC Assessment: UU0153
ITAC logo
ITAC Assessment: UU0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Treated water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 25,000
ft2
Annual Production 3,650,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,368 3,154,800
kWh
Electricity Demand $66,758 5,868
kW-mo/yr
Natural Gas $37,959 5,415
MMBtu
TOTAL YEARLY COSTS $241,085
RECOMMENDED SAVINGS* $96,968 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,021

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $48,728 $423,632 $33,253
769,202
kWh
$24,226
-
kW-mo/yr
- $(-8,750.0) - -
02 2.4323: Use optimum size and capacity equipment $14,902 $205,000 $10,639
246,099
kWh
$4,263
-
kW-mo/yr
- - - -
03 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $22,776 $146,977 $24,615
569,400
kWh
$8,876
-
kW-mo/yr
$(-6,160.6)
-
MMBtu
- - $(-4,555.2)
04 2.2511: Insulate bare equipment $5,443 $502 - - $5,443
-
MMBtu
- - -
05 2.8113: Purchase gas directly from a contract gas supplier $2,777 $6,500 - - - - $2,777 -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $899 $2,019 $930
21,510
kWh
$612
-
kW-mo/yr
$(-643.3)
-
MMBtu
- - -
07 2.1133: Adjust burners for efficient operation $1,444 $400 - - $1,444
-
MMBtu
- - -
TOTAL RECOMMENDED $96,968 $785,030 $69,437
1,606,211
kWh
$37,977
-
kW-mo/yr
$83
-
MMBtu
$(-8,750.0) $2,777 $(-4,555.2)
TOTAL IMPLEMENTED $20,021 $213,919 $11,569
267,609
kWh
$4,875
-
kW-mo/yr
$801
-
MMBtu
- $2,777 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs