| Assessment Year | 2019 |
|---|---|
| Principal Product | Treated water |
| NAICS | 221310: Water Supply and Irrigation Systems |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 10 |
| Plant Area |
25,000
ft2
|
| Annual Production | 3,650,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $136,368 | 3,154,800 |
kWh
|
$0.043 |
| Electricity Demand | $66,758 | 5,868 |
kW-mo/yr
|
$11.38 |
| Natural Gas | $37,959 | 5,415 |
MMBtu
|
$7.01 |
| TOTAL YEARLY COSTS | $241,085 | |||
| RECOMMENDED SAVINGS* | $96,968 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,021 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $48,728 | $423,632 |
$33,253
769,202
kWh
|
$24,226
-
kW-mo/yr
|
- | $(-8,750.0) | - | - | |
| 02 | 2.4323: Use optimum size and capacity equipment | $14,902 | $205,000 |
$10,639
246,099
kWh
|
$4,263
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $22,776 | $146,977 |
$24,615
569,400
kWh
|
$8,876
-
kW-mo/yr
|
$(-6,160.6)
-
MMBtu
|
- | - | $(-4,555.2) | |
| 04 | 2.2511: Insulate bare equipment | $5,443 | $502 | - | - |
$5,443
-
MMBtu
|
- | - | - | |
| 05 | 2.8113: Purchase gas directly from a contract gas supplier | $2,777 | $6,500 | - | - | - | - | $2,777 | - | |
| 06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $899 | $2,019 |
$930
21,510
kWh
|
$612
-
kW-mo/yr
|
$(-643.3)
-
MMBtu
|
- | - | - | |
| 07 | 2.1133: Adjust burners for efficient operation | $1,444 | $400 | - | - |
$1,444
-
MMBtu
|
- | - | - | |
| TOTAL RECOMMENDED | $96,968 | $785,030 |
$69,437
1,606,211
kWh
|
$37,977
-
kW-mo/yr
|
$83
-
MMBtu
|
$(-8,750.0) | $2,777 | $(-4,555.2) | ||
| TOTAL IMPLEMENTED | $20,021 | $213,919 |
$11,569
267,609
kWh
|
$4,875
-
kW-mo/yr
|
$801
-
MMBtu
|
- | $2,777 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs