Assessment Year | 2023 |
---|---|
Principal Product | Rubber Extrusion |
NAICS | 326299: All Other Rubber Product Manufacturing |
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
171,136
ft2
|
Annual Production | 10,144,812
lb
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $568,647 | 11,888,250 |
kWh
|
$0.048 | |
Electricity Demand | $381,510 | 22,584 |
kW-mo/yr
|
$16.89 | |
Electricity Fees | $113 | - |
|
- | |
Natural Gas | $67,025 | 9,476 |
MMBtu
|
$7.07 | |
Waste Disposal Costs | |||||
Water Usage | $40,738 | 11,128 |
Tgal
|
$3.66 | |
Water Disposal | $41,844 | 11,128 |
Tgal
|
$3.76 | |
Other Liquid (non-haz) | $113 | 1 |
gal
|
$113.00 | |
TOTAL YEARLY COSTS | $1,099,990 | ||||
RECOMMENDED SAVINGS* | $98,256 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $44,543 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $31,978 | - |
$31,978
669,006
kWh
|
- | - | - | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,796 | $300 |
$2,469
51,663
kWh
|
$1,327
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,461 | $952 |
$2,592
54,218
kWh
|
$1,869
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $2,894 | $1,403 |
$2,894
60,554
kWh
|
- | - | - | - | - | |
05 | 2.4224: Upgrade controls on compressors | $1,799 | - |
$1,045
21,857
kWh
|
$754
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.7135: Install occupancy sensors | $1,372 | $1,389 |
$911
19,051
kWh
|
- | - | - | $79 | $382 | |
07 | 3.4111: Use closed cycle process to minimize waste water production | $51,914 | $75,982 |
$(-19,809.0)
(-414,421)
kWh
|
$(-1,191.0)
-
kW-mo/yr
|
$35,966
-
Tgal
|
$36,948
-
Tgal
|
- | - | |
08 | 2.2514: Cover open tanks | $42 | $2,000 |
$42
882
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $98,256 | $82,026 |
$22,122
462,810
kWh
|
$2,759
-
kW-mo/yr
|
$35,966
-
Tgal
|
$36,948
-
Tgal
|
$79 | $382 | ||
TOTAL IMPLEMENTED | $44,543 | $6,044 |
$40,886
855,374
kWh
|
$3,196
-
kW-mo/yr
|
- | - | $79 | $382 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs