Assessment Year | 2019 |
---|---|
Principal Product | Water Distribution |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $1 M to 5M |
# of Employees | 15 |
Plant Area |
1,450,000,000
ft2
|
Annual Production | 502,864,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $233,092 | 3,613,300 |
kWh
|
$0.065 |
Electricity Demand | $35,538 | 2,939 |
kW-mo/yr
|
$12.09 |
Electricity Fees | $22,671 | - |
|
- |
Natural Gas | $892 | 117 |
MMBtu
|
$7.64 |
TOTAL YEARLY COSTS | $292,193 | |||
RECOMMENDED SAVINGS* | $117,191 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $103,176 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|
01 | 4.212: Adopt in-house material generation | $102,278 | $823,000 |
$(-6,184.0)
(-77,303)
kWh
|
$108,462 | |
02 | 2.5121: Redesign flow to minimize mass transfer length | $14,015 | $46,625 |
$14,015
169,730
kWh
|
- | |
03 | 2.2223: Enhance sensitivity of temperature control and cutoff | $898 | $1,650 |
$898
11,225
kWh
|
- | |
TOTAL RECOMMENDED | $117,191 | $871,275 |
$8,729
103,652
kWh
|
$108,462 | ||
TOTAL IMPLEMENTED | $103,176 | $824,650 |
$(-5,286.0)
(-66,078)
kWh
|
$108,462 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs