ITAC Assessment: UU0155
ITAC logo
ITAC Assessment: UU0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Water Distribution
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 1,450,000,000
ft2
Annual Production 502,864,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,092 3,613,300
kWh
Electricity Demand $35,538 2,939
kW-mo/yr
Electricity Fees $22,671 -
Natural Gas $892 117
MMBtu
TOTAL YEARLY COSTS $292,193
RECOMMENDED SAVINGS* $117,191 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $103,176

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Primary Raw Material Savings
01 4.212: Adopt in-house material generation $102,278 $823,000 $(-6,184.0)
(-77,303)
kWh
$108,462
02 2.5121: Redesign flow to minimize mass transfer length $14,015 $46,625 $14,015
169,730
kWh
-
03 2.2223: Enhance sensitivity of temperature control and cutoff $898 $1,650 $898
11,225
kWh
-
TOTAL RECOMMENDED $117,191 $871,275 $8,729
103,652
kWh
$108,462
TOTAL IMPLEMENTED $103,176 $824,650 $(-5,286.0)
(-66,078)
kWh
$108,462
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs