Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

657

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Water supply and irrigation systems
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0508 #02 Y:2021 Eliminate/reduce an operation $20,000 $200
AS0508 #01 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $79,572 $28,606
UU0183 #08 Y:2021 Improve air circulation with destratification fans / other methods $794 $1,175
UU0183 #07 Y:2021 Utilize higher efficiency lamps and/or ballasts $6,906 $22,506
UU0183 #06 Y:2021 Use computer programs to optimize hvac performance $15,681 $1,607
UU0183 #05 Y:2021 Utilize other methods to remove contaminants $19,111 $20,527
UU0183 #04 Y:2021 Change rate schedules or other changes in utility service $35,893 $14,200
UU0183 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $100,049 $157,500
UU0183 #02 Y:2021 Install equipment to utilize waste fuel $118,667 $7,000
UU0183 #01 Y:2021 Sell combustible waste $149,294 $144,000
AS0504 #06 Y:2021 Install heat pipes / raise cooling setpoint $1,029 $245
AS0504 #05 Y:2021 Install occupancy sensors $2,778 $3,974
AS0504 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $3,467 $4,029
AS0504 #03 Y:2021 Replace existing hvac unit with high efficiency model $4,011 $18,815
AS0504 #02 Y:2021 Reschedule plant operations or reduce load to avoid peaks $8,984 $2,000
AS0504 #01 Y:2021 Combine utility meters $73,584 $1,313
AS0503 #09 Y:2021 Install heat pipes / raise cooling setpoint $2,192 $434
AS0503 #08 Y:2021 Utilize higher efficiency lamps and/or ballasts $7,438 $14,828
AS0503 #07 Y:2021 Install occupancy sensors $9,147 $2,290
AS0503 #06 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $9,834 $5,555