Assessment Year | 2021 |
---|---|
Principal Product | Potable Water |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | less than $500 k |
# of Employees | 18 |
Plant Area |
61,006
ft2
|
Annual Production | 13,067,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $661,588 | 12,159,279 |
kWh
|
$0.054 |
Electricity Demand | $221,627 | 26,349 |
kW-mo/yr
|
$8.41 |
Electricity Fees | $83,879 | - |
|
- |
TOTAL YEARLY COSTS | $967,094 | |||
RECOMMENDED SAVINGS* | $93,853 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,258 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Coal Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8112: Combine utility meters | $73,584 | $1,313 | - | - | $17,170 |
$56,414
-
MMBtu
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,984 | $2,000 |
$3,159
-
kWh
|
$5,825
-
kW-mo/yr
|
- | - | - | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $4,011 | $18,815 |
$2,788
51,241
kWh
|
$1,223
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,467 | $4,029 |
$2,465
45,305
kWh
|
$522
-
kW-mo/yr
|
- | - | $480 | |
05 | 2.7135: Install occupancy sensors | $2,778 | $3,974 |
$2,778
48,597
kWh
|
- | - | - | - | |
06 | 2.7272: Install heat pipes / raise cooling setpoint | $1,029 | $245 |
$697
12,890
kWh
|
$332
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $93,853 | $30,376 |
$11,887
158,033
kWh
|
$7,902
-
kW-mo/yr
|
$17,170 |
$56,414
-
MMBtu
|
$480 | ||
TOTAL IMPLEMENTED | $16,258 | $10,248 |
$9,099
106,792
kWh
|
$6,679
-
kW-mo/yr
|
- | - | $480 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Coal Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs