ITAC Assessment: CI0079
ITAC logo
ITAC Assessment: CI0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Aluminum Forgings
NAICS 332112: Nonferrous Forging
SIC 3463: Nonferrous Forgings
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 50,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 5,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $556,196 3,770,876
kWh
Electricity Demand $354,281 11,874
kW-mo/yr
Electricity Fees $109,106 -
Natural Gas $488,996 48,152
MMBtu
LPG $66,000 2,011
MMBtu
Other Gas $27,085 1
MMBtu
TOTAL YEARLY COSTS $1,601,664
RECOMMENDED SAVINGS* $812,883 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Increase in Production Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $452,150 $420,000 - - $122,150
-
MMBtu
- $330,000
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $215,504 $8,400 $180,457
1,223,440
kWh
$35,047
-
kW-mo/yr
- - -
03 2.8227: Adjust / maintain fork lift trucks for most efficient operation $45,925 $176,000 $(-12,980.0)
(-88,000)
kWh
$(-7,095.0)
-
kW-mo/yr
- $66,000
-
MMBtu
-
04 2.1122: Re-size charging openings or add a movable door on equipment $40,621 $150,000 - - $40,621
-
MMBtu
- -
05 2.4239: Eliminate or reduce compressed air usage $30,034 $3,000 $22,007
149,200
kWh
$8,027
-
kW-mo/yr
- - -
06 2.9114: Use solar heat to make electricty $13,645 $73,418 $10,213
69,240
kWh
$3,432
-
kW-mo/yr
- - -
07 2.2442: Preheat combustion air with waste heat $11,069 $15,840 - - $11,069
-
MMBtu
- -
08 2.2511: Insulate bare equipment $3,935 $500 $2,649
17,961
kWh
$1,286
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $812,883 $847,158 $202,346
1,371,841
kWh
$40,697
-
kW-mo/yr
$173,840
-
MMBtu
$66,000
-
MMBtu
$330,000
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs