ITAC Assessment: MS0015
ITAC logo
ITAC Assessment: MS0015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Automotive Ball Joints and Rack and Pinion Rebuilds
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area
n/a
Annual Production 5,632,550
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,829 2,914,420
kWh
Natural Gas $58,326 6,735
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,969 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,248

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3132: Recharge batteries on during off-peak demand periods $4,248 - $4,248
-
kWh
-
02 2.2437: Recover waste heat from equipment $2,747 $1,500 - $2,747
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,919 $4,270 $1,919
44,842
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $850 $277 $850
15,826
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $205 - $205
3,810
kWh
-
TOTAL RECOMMENDED $9,969 $6,047 $7,222
64,478
kWh
$2,747
-
MMBtu
TOTAL IMPLEMENTED $4,248 - $4,248
-
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs