Assessment Year | 2021 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4952: Sewerage Systems |
Sales Range | $10 M to 50M |
# of Employees | 33 |
Plant Area |
105,000
ft2
|
Annual Production | 11,680,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $376,194 | 11,510,400 |
kWh
|
$0.033 |
Electricity Demand | $269,768 | 19,738 |
kW-mo/yr
|
$13.67 |
Electricity Fees | $17,258 | - |
|
- |
Natural Gas | $146,506 | 24,116 |
MMBtu
|
$6.08 |
TOTAL YEARLY COSTS | $809,726 | |||
RECOMMENDED SAVINGS* | $446,395 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $190,992 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.6125: Sell combustible waste | $149,294 | $144,000 | - | - | - | $149,294 | |
02 | 2.1336: Install equipment to utilize waste fuel | $118,667 | $7,000 | - | - |
$118,667
-
MMBtu
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $100,049 | $157,500 |
$100,049
3,031,779
kWh
|
- | - | - | |
04 | 2.8114: Change rate schedules or other changes in utility service | $35,893 | $14,200 | - | - | - | $35,893 | |
05 | 3.3128: Utilize other methods to remove contaminants | $19,111 | $20,527 |
$19,111
579,121
kWh
|
- | - | - | |
06 | 2.7226: Use computer programs to optimize hvac performance | $15,681 | $1,607 |
$5,348
162,066
kWh
|
- |
$10,333
-
MMBtu
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,906 | $22,506 |
$2,098
63,585
kWh
|
$4,807
-
kW-mo/yr
|
- | - | |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $794 | $1,175 |
$(-57.0)
(-1,740)
kWh
|
- |
$851
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $446,395 | $368,515 |
$126,549
3,834,811
kWh
|
$4,807
-
kW-mo/yr
|
$129,851
-
MMBtu
|
$185,187 | ||
TOTAL IMPLEMENTED | $190,992 | $188,640 |
$26,557
804,772
kWh
|
$4,807
-
kW-mo/yr
|
$10,333
-
MMBtu
|
$149,294 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs