ITAC Assessment: NC0452
ITAC logo
ITAC Assessment: NC0452
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Museum
NAICS 712110: Museums
SIC 8412: Museums and Art Galleries
Sales Range less than $500
k
# of Employees 4
Plant Area 20,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,960
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,778 525,880
kWh
Electricity Demand $7,412 1,112
kW-mo/yr
Electricity Fees $400 -
Fuel Oil #2 $54,444 2,248
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,493

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,629 $10,000 $4,909
61,101
kWh
$582
-
kW-mo/yr
$4,138
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,864 $3,200 - - $2,864
-
MMBtu
-
03 2.7135: Install occupancy sensors $269 $375 $269
3,343
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $270 $297 $118
1,474
kWh
$79
-
kW-mo/yr
- $73
05 2.9112: Use solar heat to heat water $10,485 $62,000 - - $10,485
-
MMBtu
-
TOTAL RECOMMENDED $23,517 $75,872 $5,296
65,918
kWh
$661
-
kW-mo/yr
$17,487
-
MMBtu
$73
TOTAL IMPLEMENTED $12,493 $13,200 $4,909
61,101
kWh
$582
-
kW-mo/yr
$7,002
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs