Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

657

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Water supply and irrigation systems
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0842 #05 Y:2022 Utilize higher efficiency lamps and/or ballasts $2,119 $11,630
MA0842 #04 Y:2022 Change procedures / equipment / operating conditions $2,289 $900
MA0842 #03 Y:2022 Use heat pump for space conditioning $5,243 $7,450
MA0842 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $19,685 $11,100
MA0842 #01 Y:2022 Use solar heat to make electricty $50,962 $247,937
UU0203 #03 Y:2022 Utilize controls to operate equipment only when needed $3,080 $10,070
UU0203 #02 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $19,358 $60,000
UU0203 #01 Y:2022 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $33,490 $103,200
MA0834 #04 Y:2022 Change procedures / equipment / operating conditions $263 $900
MA0834 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $1,172 $5,632
MA0834 #02 Y:2022 Use heat pump for space conditioning $4,705 $2,150
MA0834 #01 Y:2022 Use solar heat to make electricty $88,978 $607,766
UU0200 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $2,392 $5,232
UU0200 #02 Y:2022 Change procedures / equipment / operating conditions $3,992 $10,000
UU0200 #01 Y:2022 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $41,228 $52,800
WM0176 #06 Y:2022 Lower temperature during the winter season and vice-versa $1,301 -
WM0176 #05 Y:2022 Install occupancy sensors $2,638 $6,572
WM0176 #04 Y:2022 Use waste heat from hot flue gases to preheat $4,784 $7,000
WM0176 #03 Y:2022 Optimize plant power factor $6,319 $24,625
WM0176 #02 Y:2022 Use synthetic lubricant $12,068 $10,000