ITAC Assessment: UU0203
ITAC logo
ITAC Assessment: UU0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Water Distribution
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 9
Plant Area 16,574
ft2
Annual Production 1,002,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,878 2,314,254
kWh
Electricity Demand $1,622 330
kW-mo/yr
Electricity Fees $190,501 -
Natural Gas $7,690 893
MMBtu
TOTAL YEARLY COSTS $388,691
RECOMMENDED SAVINGS* $55,928 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $33,490 $103,200 $17,673
205,510
kWh
- $15,817
-
Tgal
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,358 $60,000 $19,358
229,695
kWh
- -
03 2.6231: Utilize controls to operate equipment only when needed $3,080 $10,070 $2,402
29,340
kWh
$678
-
MMBtu
-
TOTAL RECOMMENDED $55,928 $173,270 $39,433
464,545
kWh
$678
-
MMBtu
$15,817
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs