ITAC Assessment: MO0028
ITAC logo
ITAC Assessment: MO0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ADHESIVES & SEALANTS
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 244
Plant Area
n/a
Annual Production 5,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $758,624 16,301,583
kWh
Natural Gas $463,931 100,218
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,206

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $8,773 $802 $7,274
156,213
kWh
$1,499
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,834 $1,339 $9,834
211,313
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,422 $1,295 - $2,422
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,957 $10,464 $5,957
128,077
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,955 - $4,955
106,389
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,265 $90 $3,265
70,047
kWh
-
TOTAL RECOMMENDED $35,206 $13,990 $31,285
672,039
kWh
$3,921
-
MMBtu
TOTAL IMPLEMENTED $35,206 $13,990 $31,285
672,039
kWh
$3,921
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs