ITAC Assessment: GT0770
ITAC logo
ITAC Assessment: GT0770
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product METAL PLATING
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 95
Plant Area 55,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $140,545 2,977,329
kWh
Natural Gas $6,437 6,019
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,781 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $490 - $490
15,982
kWh
-
02 2.6231: Utilize controls to operate equipment only when needed $900 $2,600 $900
29,595
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $109 $287 $109
3,567
kWh
-
04 2.2437: Recover waste heat from equipment $1,276 $2,600 $(-32.0)
(-1,041)
kWh
$1,308
-
MMBtu
05 2.7111: Reduce illumination to minimum necessary levels $1,380 - $1,380
45,000
kWh
-
06 2.6218: Turn off equipment when not in use $6,626 - $6,626
216,000
kWh
-
TOTAL RECOMMENDED $10,781 $5,487 $9,473
309,103
kWh
$1,308
-
MMBtu
TOTAL IMPLEMENTED $8,605 $287 $8,605
280,549
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs