ITAC Assessment: MA0842
ITAC logo
ITAC Assessment: MA0842
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Treated water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $1
M
to 5
M
# of Employees 8
Plant Area 25,000
ft2
Annual Production 1,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $205,954 1,031,800
kWh
Electricity Demand $57,973 2,560
kW-mo/yr
Electricity Fees $1,536 -
Natural Gas $8,818 1,508
MMBtu
TOTAL YEARLY COSTS $274,281
RECOMMENDED SAVINGS* $80,298 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,047

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $50,962 $247,937 $30,791
154,264
kWh
$6,251
-
kW-mo/yr
$13,920
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,685 $11,100 $19,685
98,623
kWh
- -
03 2.7234: Use heat pump for space conditioning $5,243 $7,450 $4,541
22,750
kWh
$702
-
kW-mo/yr
-
04 3.1191: Change procedures / equipment / operating conditions $2,289 $900 $2,289
11,473
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,119 $11,630 $1,032
5,171
kWh
$1,087
-
kW-mo/yr
-
TOTAL RECOMMENDED $80,298 $279,017 $58,338
292,281
kWh
$8,040
-
kW-mo/yr
$13,920
TOTAL IMPLEMENTED $27,047 $30,180 $25,258
126,544
kWh
$1,789
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs