ITAC Assessment: KU0377
ITAC logo
ITAC Assessment: KU0377
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product COOKIES, CRACKERS, ETC
NAICS
n/a
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 26,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,109 2,404,162
kWh
Natural Gas $151,068 49,924
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,347 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,946 $3,885 $1,946
42,497
kWh
-
02 2.2437: Recover waste heat from equipment $1,936 $700 - $1,936
-
MMBtu
03 2.1222: Install turbulators $1,406 $2,122 - $1,406
-
MMBtu
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $645 $1,847 - $645
-
MMBtu
05 2.7494: Install storm windows and doors $476 $154 - $476
-
MMBtu
06 2.6232: Install set-back timers $1,731 $1,200 $1,731
37,808
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $590 $450 $590
12,896
kWh
-
08 2.2621: Modify refrigeration system to operate at a lower pressure $617 $1,600 $617
13,482
kWh
-
TOTAL RECOMMENDED $9,347 $11,958 $4,884
106,683
kWh
$4,463
-
MMBtu
TOTAL IMPLEMENTED $6,149 $7,811 $4,267
93,201
kWh
$1,882
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs