2,373
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UW2413 #06 Y:2024 | 06 | 2024 | Use most efficient type of electric motors | $3,582 | $7,250 | |
| UW2413 #05 Y:2024 | 05 | 2024 | Install occupancy sensors | $53 | $229 | |
| UW2413 #04 Y:2024 | 04 | 2024 | Use or replace with energy efficient substitutes | $12,186 | $5,713 | |
| UW2413 #03 Y:2024 | 03 | 2024 | Level zero – install control systems for existing equipment | $20,435 | $58,800 | |
| UW2413 #02 Y:2024 | 02 | 2024 | Level two – install control system using iiot devices with communication capabilities to store data to the cloud | $25,793 | $13,368 | |
| UW2413 #01 Y:2024 | 01 | 2024 | Add/modify equipment to improve drying process | $8,896 | $25,250 | |
| DL0243 #03 Y:2024 | 03 | 2024 | Eliminate/reduce an operation | $2,346 | $520 | |
| DL0243 #02 Y:2024 | 02 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $10,139 | $51,000 | |
| DL0243 #01 Y:2024 | 01 | 2024 | Utilize controls to operate equipment only when needed | $8,211 | $64,000 | |
| MUWT06 #10 Y:2024 | 10 | 2024 | Pay bills on time to avoid late fees | $7,951 | - | |
| MUWT06 #09 Y:2024 | 09 | 2024 | Use proper thickness of insulation on building envelope | $2,478 | $6,690 | |
| MUWT06 #08 Y:2024 | 08 | 2024 | Reduce space conditioning during non-working hours | $1,263 | - | |
| MUWT06 #07 Y:2024 | 07 | 2024 | Lower temperature during the winter season and vice-versa | $11,231 | - | |
| MUWT06 #06 Y:2024 | 06 | 2024 | Utilize higher efficiency lamps and/or ballasts | $3,226 | $5,494 | |
| MUWT06 #05 Y:2024 | 05 | 2024 | Install occupancy sensors | $1,139 | $563 | |
| MUWT06 #04 Y:2024 | 04 | 2024 | Use or replace with energy efficient substitutes | $12,582 | $8,363 | |
| MUWT06 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $20 | $20 | |
| MUWT06 #02 Y:2024 | 02 | 2024 | Reduce the pressure of compressed air to the minimum required | $106 | - | |
| MUWT06 #01 Y:2024 | 01 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $669 | $4,646 | |
| OR0797 #06 Y:2024 | 06 | 2024 | Use solar heat to make electricty | $43,815 | $607,740 |