| Assessment Year | 2024 |
|---|---|
| Principal Product | Slude, Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $1 M to 5M |
| # of Employees | 4 |
| Plant Area |
210,000
ft2
|
| Annual Production | 40,150
Tgal
|
| Production Hrs. Annual | 3,822
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $75,968 | 2,770,827 |
kWh
|
$0.027 |
| Electricity Demand | $40,056 | 5,932 |
kW-mo/yr
|
$6.75 |
| Electricity Fees | $10,366 | - |
|
- |
| Fuel Oil #1 | $10,300 | 290 |
MMBtu
|
$35.52 |
| TOTAL YEARLY COSTS | $136,690 | |||
| RECOMMENDED SAVINGS* | $70,945 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $70,945 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.114: Add/modify equipment to improve drying process | $8,896 | $25,250 | - | - |
$8,896
-
MMBtu
|
- | |
| 02 | 4.663: Level two – install control system using iiot devices with communication capabilities to store data to the cloud | $25,793 | $13,368 |
$15,194
554,165
kWh
|
- | - | $10,599 | |
| 03 | 4.661: Level zero – install control systems for existing equipment | $20,435 | $58,800 |
$19,868
735,840
kWh
|
$567
-
kW-mo/yr
|
- | - | |
| 04 | 2.4322: Use or replace with energy efficient substitutes | $12,186 | $5,713 |
$12,186
444,738
kWh
|
- | - | - | |
| 05 | 2.7135: Install occupancy sensors | $53 | $229 |
$53
1,971
kWh
|
- | - | - | |
| 06 | 2.4133: Use most efficient type of electric motors | $3,582 | $7,250 |
$3,582
130,645
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $70,945 | $110,610 |
$50,883
1,867,359
kWh
|
$567
-
kW-mo/yr
|
$8,896
-
MMBtu
|
$10,599 | ||
| TOTAL IMPLEMENTED | $70,945 | $110,610 |
$50,883
1,867,359
kWh
|
$567
-
kW-mo/yr
|
$8,896
-
MMBtu
|
$10,599 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs