ITAC Assessment: UW2413
ITAC logo
ITAC Assessment: UW2413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Slude, Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 4
Plant Area 210,000
ft2
Annual Production 40,150
Tgal
Production Hrs. Annual 3,822
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,968 2,770,827
kWh
Electricity Demand $40,056 5,932
kW-mo/yr
Electricity Fees $10,366 -
Fuel Oil #1 $10,300 290
MMBtu
TOTAL YEARLY COSTS $136,690
RECOMMENDED SAVINGS* $70,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings
01 4.114: Add/modify equipment to improve drying process $8,896 $25,250 - - $8,896
-
MMBtu
-
02 4.663: Level two – install control system using iiot devices with communication capabilities to store data to the cloud $25,793 $13,368 $15,194
554,165
kWh
- - $10,599
03 4.661: Level zero – install control systems for existing equipment $20,435 $58,800 $19,868
735,840
kWh
$567
-
kW-mo/yr
- -
04 2.4322: Use or replace with energy efficient substitutes $12,186 $5,713 $12,186
444,738
kWh
- - -
05 2.7135: Install occupancy sensors $53 $229 $53
1,971
kWh
- - -
06 2.4133: Use most efficient type of electric motors $3,582 $7,250 $3,582
130,645
kWh
- - -
TOTAL RECOMMENDED $70,945 $110,610 $50,883
1,867,359
kWh
$567
-
kW-mo/yr
$8,896
-
MMBtu
$10,599
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs