ITAC Assessment: OK0531
ITAC logo
ITAC Assessment: OK0531
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Swimming pool and hygiene chemicals
NAICS
n/a
SIC 2812: Alkalies and Chlorine
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 140,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,835 1,333,236
kWh
Electricity Demand $44,183 4,627
kW-mo/yr
Electricity Fees $4,006 -
Natural Gas $17,844 3,594
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,079

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $21,470 - - $21,470
-
kW-mo/yr
- -
02 2.7122: Disconnect ballasts $1,079 $500 $453
17,292
kWh
$626
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $631 $1,870 $194
7,327
kWh
$81
-
kW-mo/yr
- $356
04 3.5316: Contract a wood pallet recycling company $8,000 - - - $8,000
-
lb
-
05 4.431: Train operators for maximum operating efficiency $27,300 - - - - $27,300
06 4.423: Move product using mechanical means $27,300 $150,000 - - - $27,300
TOTAL RECOMMENDED $85,780 $152,370 $647
24,619
kWh
$22,177
-
kW-mo/yr
$8,000
-
lb
$54,956
TOTAL IMPLEMENTED $9,079 $500 $453
17,292
kWh
$626
-
kW-mo/yr
$8,000
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs