ITAC Assessment: IP0142
ITAC logo
ITAC Assessment: IP0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Sound and Vibration Products
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 58,987
ft2
Annual Production 210,000
pieces
Production Hrs. Annual 3,900
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,391 1,197,204
kWh
Electricity Demand $20,706 3,857
kW-mo/yr
Electricity Fees $58,561 -
Natural Gas $15,334 2,418
MMBtu
Waste Disposal Costs
Water Usage $2,351 193
Tgal
TOTAL YEARLY COSTS $193,343
RECOMMENDED SAVINGS* $34,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,989

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 4.821: Pay bills on time to avoid late fees $580 - - - $580 -
02 2.8112: Combine utility meters $494 - - - $494 -
03 2.3212: Optimize plant power factor $14,194 $1,910 - - $14,194 -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $94 $40 $71
939
kWh
$23
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $402 $200 $402
5,313
kWh
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $146 $100 $110
1,455
kWh
$36
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $804 $728 $640
8,502
kWh
$164
-
kW-mo/yr
- -
08 2.8121: Apply for tax-free status for energy purchases $6,803 $8,000 - - $6,803 -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $25 $40 $17
234
kWh
$8
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $4,597 $14,185 $3,422
45,406
kWh
$1,175
-
kW-mo/yr
- -
11 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $5,902 $22,000 - - - $5,902
-
MMBtu
TOTAL RECOMMENDED $34,041 $47,203 $4,662
61,849
kWh
$1,406
-
kW-mo/yr
$22,071 $5,902
-
MMBtu
TOTAL IMPLEMENTED $5,989 $14,953 $4,133
54,847
kWh
$1,362
-
kW-mo/yr
$494 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs