ITAC Assessment: SD0116
ITAC logo
ITAC Assessment: SD0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Sporting Equipment
NAICS
n/a
SIC 3949: Sporting and Athletic Goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 110,000
ft2
Annual Production 362,000
units
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,521 996,190
kWh
Natural Gas $5,641 810
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,755

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $979 $1,700 $979
8,206
kWh
02 2.4226: Use / purchase optimum sized compressor $705 $1,100 $705
5,569
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $211 $20 $211
1,758
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,905 $29,454 $12,905
104,338
kWh
05 2.7144: Install spectral reflectors / delamp $18,871 $20,540 $18,871
143,318
kWh
06 2.7135: Install occupancy sensors $2,699 $3,480 $2,699
20,516
kWh
TOTAL RECOMMENDED $36,370 $56,294 $36,370
283,705
kWh
TOTAL IMPLEMENTED $32,755 $51,694 $32,755
255,862
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs