ITAC Assessment: WM0106
ITAC logo
ITAC Assessment: WM0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Treat Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 47,810
ft2
Annual Production 80,001
units
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,723 2,508,775
kWh
Electricity Demand $39,107 4,650
kW-mo/yr
Electricity Fees $28,238 -
Natural Gas $18,845 2,901
MMBtu
Waste Disposal Costs
Water Usage $933 13,350
Tgal
TOTAL YEARLY COSTS $237,846
RECOMMENDED SAVINGS* $105,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,432

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $68,853 $480,000 $64,386
1,071,671
kWh
- $4,467
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,721 $49,500 $12,721
165,432
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,613 $11,130 $10,613
146,785
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,352 $3,278 $4,352
52,749
kWh
- -
05 2.7221: Lower temperature during the winter season and vice-versa $2,204 - - - $2,204
-
MMBtu
06 2.4314: Use synthetic lubricant $1,915 $11,475 $1,915
22,137
kWh
- -
07 2.2211: Use optimum temperature $1,605 - $535
8,902
kWh
$1,070
-
kW-mo/yr
-
08 2.7231: Use radiant heater for spot heating $2,133 $3,818 - - $2,133
-
MMBtu
09 2.7135: Install occupancy sensors $1,138 $600 $1,138
15,651
kWh
- -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $416 $800 $87
1,456
kWh
$329
-
kW-mo/yr
-
TOTAL RECOMMENDED $105,950 $560,601 $95,747
1,484,783
kWh
$1,398
-
kW-mo/yr
$8,804
-
MMBtu
TOTAL IMPLEMENTED $11,432 $7,696 $6,025
77,302
kWh
$1,070
-
kW-mo/yr
$4,337
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs