Assessment Year | 2001 |
---|---|
Principal Product | Flexible Packaging Products |
NAICS |
n/a
|
SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
133,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $197,751 | 7,182,022 |
kWh
|
$0.028 |
Electricity Demand | $152,319 | 16,502 |
kW-mo/yr
|
$9.23 |
Electricity Fees | $24,933 | - |
|
- |
Natural Gas | $202,922 | 57,587 |
MMBtu
|
$3.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $242,156 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $172,934 | $560,000 |
$202,531
7,008,000
kWh
|
$93,024
-
kW-mo/yr
|
$(-120,874.0)
-
MMBtu
|
$(-1,747.0) | - | |
02 | 4.514: Re-arrange equipment layout to reduce handling costs | $40,600 | $10,000 | - | - | - | $40,600 | - | |
03 | 3.7131: Use a rag recycle service | $11,777 | - | - | - | - | - | $11,777 | |
04 | 2.7135: Install occupancy sensors | $6,365 | $4,500 |
$4,734
163,798
kWh
|
$1,631
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,350 | - |
$1,004
34,732
kWh
|
$346
-
kW-mo/yr
|
- | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,004 | $1,920 |
$3,588
124,164
kWh
|
$1,416
-
kW-mo/yr
|
- | - | - | |
07 | 2.2437: Recover waste heat from equipment | $3,983 | $1,000 | - | - |
$3,983
-
MMBtu
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $143 | $30 |
$106
3,660
kWh
|
$37
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $242,156 | $577,450 |
$211,963
7,334,354
kWh
|
$96,454
-
kW-mo/yr
|
$(-116,891.0)
-
MMBtu
|
$38,853 | $11,777 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs