ITAC Assessment: WI0396
ITAC logo
ITAC Assessment: WI0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Flexible Packaging Products
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 133,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,751 7,182,022
kWh
Electricity Demand $152,319 16,502
kW-mo/yr
Electricity Fees $24,933 -
Natural Gas $202,922 57,587
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $242,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $172,934 $560,000 $202,531
7,008,000
kWh
$93,024
-
kW-mo/yr
$(-120,874.0)
-
MMBtu
$(-1,747.0) -
02 4.514: Re-arrange equipment layout to reduce handling costs $40,600 $10,000 - - - $40,600 -
03 3.7131: Use a rag recycle service $11,777 - - - - - $11,777
04 2.7135: Install occupancy sensors $6,365 $4,500 $4,734
163,798
kWh
$1,631
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,350 - $1,004
34,732
kWh
$346
-
kW-mo/yr
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,004 $1,920 $3,588
124,164
kWh
$1,416
-
kW-mo/yr
- - -
07 2.2437: Recover waste heat from equipment $3,983 $1,000 - - $3,983
-
MMBtu
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $143 $30 $106
3,660
kWh
$37
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $242,156 $577,450 $211,963
7,334,354
kWh
$96,454
-
kW-mo/yr
$(-116,891.0)
-
MMBtu
$38,853 $11,777
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs