Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Electric power generation, transmission and distribution
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0549 #04 Y:2019 Develop standard procedures to improve internal yields $492,292 $1,875,550
UF0549 #03 Y:2019 Utilize higher efficiency lamps and/or ballasts $6,001 $2,904
UF0549 #02 Y:2019 Use most efficient type of electric motors $73,018 $68,138
UF0549 #01 Y:2019 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $737,260 $2,600,000
TT0211 #07 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $13,109 $3,750
TT0211 #06 Y:2018 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $25,620 $100
TT0211 #05 Y:2018 Use optimum temperature $67,812 $300,000
TT0211 #04 Y:2018 Replace existing chiller with high efficiency model $73,737 $75,000
TT0211 #03 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $89,245 $600,000
TT0211 #02 Y:2018 Use optimum size and capacity equipment $96,921 $15,000
TT0211 #01 Y:2018 Flash condensate to produce lower pressure steam $115,103 $150,000
OR0579 #07 Y:2012 Use photocell controls $17,340 $46,680
OR0579 #06 Y:2012 Recover heat from exhausted steam, hot air or hot water $8,805 $18,596
OR0579 #05 Y:2012 Replace electrically-operated equipment with fossil fuel equipment $7,281 $12,000
OR0579 #04 Y:2012 Use / purchase optimum sized compressor $2,300 $8,200
OR0579 #03 Y:2012 Substitute compressed air cooling with water or air cooling $23,346 $55,000
OR0579 #02 Y:2012 Use most efficient type of electric motors $125,819 $198,800
OR0579 #01 Y:2012 Install adequate dryers on air lines to eliminate blowdown $15,066 -
OR0552 #04 Y:2009 Install occupancy sensors $18,800 $16,200
OR0552 #03 Y:2009 Use demand controller or load shedder $9,900 $7,400