ITAC Assessment: TT0211
ITAC logo
ITAC Assessment: TT0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Electricity Generation
NAICS 221112: Fossil Fuel Electric Power Generation
SIC 4911: Electric Services
Sales Range $100
M
to 500
M
# of Employees 50
Plant Area 10,000
ft2
Annual Production 5,455,700
units
Production Hrs. Annual 8,760
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $9,499,880 146,152,000
kWh
Natural Gas $98,641,446 32,880,482
MMBtu
TOTAL YEARLY COSTS $108,141,326
RECOMMENDED SAVINGS* $481,547 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $128,212

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2127: Flash condensate to produce lower pressure steam $115,103 $150,000 $115,103
1,770,800
kWh
-
02 2.4323: Use optimum size and capacity equipment $96,921 $15,000 $96,921
1,491,100
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $89,245 $600,000 $89,245
1,373,000
kWh
-
04 2.2622: Replace existing chiller with high efficiency model $73,737 $75,000 $81,315
1,251,000
kWh
$(-7,578.0)
-
MMBtu
05 2.2211: Use optimum temperature $67,812 $300,000 - $67,812
-
MMBtu
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $25,620 $100 $25,620
394,200
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,109 $3,750 $13,109
201,700
kWh
-
TOTAL RECOMMENDED $481,547 $1,143,850 $421,313
6,481,800
kWh
$60,234
-
MMBtu
TOTAL IMPLEMENTED $128,212 $153,750 $128,212
1,972,500
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs