ITAC Assessment: LE0198
ITAC logo
ITAC Assessment: LE0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Disposable Anesthesia Supplies
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 280
Plant Area 150,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,261 2,893,300
kWh
Electricity Demand $49,992 6,888
kW-mo/yr
Natural Gas $46,984 7,654
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,429 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,483

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $20,168 $76,950 n/a $12,690
181,285
kWh
$7,478
-
kW-mo/yr
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,500 $2,500 - $2,500
-
kW-mo/yr
03 2.4226: Use / purchase optimum sized compressor $2,443 $24,000 $2,443
34,912
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $778 $200 $654
9,345
kWh
$124
-
kW-mo/yr
05 2.4221: Install compressor air intakes in coolest locations $540 $566 $217
3,094
kWh
$323
-
kW-mo/yr
TOTAL RECOMMENDED $26,429 $104,216 $16,004
228,636
kWh
$10,425
-
kW-mo/yr
TOTAL IMPLEMENTED $5,483 $27,066 $2,660
38,006
kWh
$2,823
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs