Assessment Year | 2012 |
---|---|
Principal Product | Electricity |
NAICS | 221112: Fossil Fuel Electric Power Generation |
SIC | 4911: Electric Services |
Sales Range | $50 M to 100M |
# of Employees | 20 |
Plant Area |
30,000
ft2
|
Annual Production | 1,500,000,000
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,157,403 | 15,565,458 |
kWh
|
$0.074 |
Electricity Demand | $7,020 | 21,737 |
kW-mo/yr
|
$0.32 |
Natural Gas | $10,128 | 1,478 |
MMBtu
|
$6.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $199,958 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $55,752 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $15,066 | - |
$15,066
200,878
kWh
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $125,819 | $198,800 |
$125,819
1,677,590
kWh
|
- | - | - | |
03 | 2.4237: Substitute compressed air cooling with water or air cooling | $23,346 | $55,000 |
$23,346
311,284
kWh
|
- | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $2,300 | $8,200 |
$2,300
31,000
kWh
|
- | - | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,281 | $12,000 |
$10,950
146,000
kWh
|
$(-3,669.2)
-
MMBtu
|
- | - | |
06 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $8,805 | $18,596 | - |
$8,805
-
MMBtu
|
- | - | |
07 | 2.7134: Use photocell controls | $17,340 | $46,680 |
$16,121
214,941
kWh
|
- | $4 | $1,215 | |
TOTAL RECOMMENDED | $199,958 | $339,276 |
$193,602
2,581,692
kWh
|
$5,136
-
MMBtu
|
$4 | $1,215 | ||
TOTAL IMPLEMENTED | $55,752 | $101,680 |
$54,533
727,103
kWh
|
- | $4 | $1,215 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs