ITAC Assessment: OR0579
ITAC logo
ITAC Assessment: OR0579
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Electricity
NAICS 221112: Fossil Fuel Electric Power Generation
SIC 4911: Electric Services
Sales Range $50
M
to 100
M
# of Employees 20
Plant Area 30,000
ft2
Annual Production 1,500,000,000
units
Production Hrs. Annual 6,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,157,403 15,565,458
kWh
Electricity Demand $7,020 21,737
kW-mo/yr
Natural Gas $10,128 1,478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $199,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,752

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4222: Install adequate dryers on air lines to eliminate blowdown $15,066 - $15,066
200,878
kWh
- - -
02 2.4133: Use most efficient type of electric motors $125,819 $198,800 $125,819
1,677,590
kWh
- - -
03 2.4237: Substitute compressed air cooling with water or air cooling $23,346 $55,000 $23,346
311,284
kWh
- - -
04 2.4226: Use / purchase optimum sized compressor $2,300 $8,200 $2,300
31,000
kWh
- - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,281 $12,000 $10,950
146,000
kWh
$(-3,669.2)
-
MMBtu
- -
06 2.2449: Recover heat from exhausted steam, hot air or hot water $8,805 $18,596 - $8,805
-
MMBtu
- -
07 2.7134: Use photocell controls $17,340 $46,680 $16,121
214,941
kWh
- $4 $1,215
TOTAL RECOMMENDED $199,958 $339,276 $193,602
2,581,692
kWh
$5,136
-
MMBtu
$4 $1,215
TOTAL IMPLEMENTED $55,752 $101,680 $54,533
727,103
kWh
- $4 $1,215
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs