ITAC Assessment: MS0013
ITAC logo
ITAC Assessment: MS0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Hydraulic Line Tubing
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 79
Plant Area 165,000
ft2
Annual Production 41,000,000
thousand feet
Production Hrs. Annual 5,808
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,727 4,720,106
kWh
Natural Gas $572,374 172,543
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $247,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2422: Use waste heat from hot flue gases to generate steam $85,409 $25,000 - $85,409
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $88,825 $20,000 - $88,825
-
MMBtu
03 2.2422: Use waste heat from hot flue gases to generate steam $28,470 $25,000 - $28,470
-
MMBtu
04 2.3212: Optimize plant power factor $8,211 $7,560 $8,211
-
kWh
-
05 2.4133: Use most efficient type of electric motors $1,389 $2,850 $1,389
29,015
kWh
-
06 2.2514: Cover open tanks $1,198 $2,400 - $1,198
-
MMBtu
07 2.7111: Reduce illumination to minimum necessary levels $34,262 $5,310 $34,262
747,655
kWh
-
TOTAL RECOMMENDED $247,764 $88,120 $43,862
776,670
kWh
$203,902
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs