Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

118

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Sand, gravel, clay, and ceramic and refractory minerals mining and quarrying
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0123 #06 Y:2025 Utilize energy-efficient belts and other improved mechanisms $697 $443
NL0123 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $8,523 $9,000
NL0123 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $23,122 $24,804
NL0123 #03 Y:2025 Optimize plant power factor $206,052 $550,650
NL0123 #02 Y:2025 Upgrade conveyors $229,830 $214,000
NL0123 #01 Y:2025 Eliminate a by-product $821,100 $590,100
AS0599 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $13,723 $5,870
AS0599 #03 Y:2025 Install back-up equipment $297,917 $1,360,000
AS0599 #02 Y:2025 Redesign process $778,933 $500,000
AS0599 #01 Y:2025 Burn a less expensive grade of fuel $625,275 $321,478
OR0781 #04 Y:2023 Use or replace with energy efficient substitutes $486,797 $4,030,000
OR0781 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $618 $2,576
OR0781 #02 Y:2023 Optimize plant power factor $3,665 $20,839
OR0781 #01 Y:2023 Eliminate/reduce an operation $112,997 $116,429
LE0550 #07 Y:2023 Replace existing hvac unit with high efficiency model $5,791 $34,566
LE0550 #06 Y:2023 Use cooling tower or economizer to replace chiller cooling $4,500 $22,000
LE0550 #05 Y:2023 Eliminate a by-product $85,450 $350,000
LE0550 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $299 $1,150
LE0550 #03 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $1,539 $3,500
LE0550 #02 Y:2023 Re-use or recycle hot or cold process exhaust air $1,474 $2,500