Assessment Year | 2023 |
---|---|
Principal Product | Ceramic Materials |
NAICS | 212325: Clay and Ceramic and Refractory Minerals Mining |
SIC | 1459: Clay, Ceramic, and Refractory Minerals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 30 |
Plant Area |
60,000
ft2
|
Annual Production | 100
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $82,666 | 1,150,600 |
kWh
|
$0.072 | |
Electricity Demand | $14,330 | 2,966 |
kW-mo/yr
|
$4.83 | |
Electricity Fees | $7,348 | - |
|
- | |
Natural Gas | $10,320 | 1,021 |
MMBtu
|
$10.11 | |
Waste Disposal Costs | |||||
Water Disposal | $2,083 | 31,932 |
Tgal
|
$0.065 | |
Other Liquid (non-haz) | $192,240 | 72,000 |
gal
|
$2.67 | |
TOTAL YEARLY COSTS | $308,987 | ||||
RECOMMENDED SAVINGS* | $101,716 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $96,917 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,663 | $100 |
$2,439
33,884
kWh
|
$224
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.2443: Re-use or recycle hot or cold process exhaust air | $1,474 | $2,500 | - | - |
$1,474
-
MMBtu
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,539 | $3,500 |
$1,408
19,552
kWh
|
$131
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $299 | $1,150 |
$276
3,833
kWh
|
$23
-
kW-mo/yr
|
- | - | - | - | |
05 | 3.1181: Eliminate a by-product | $85,450 | $350,000 | - | - | - |
$(-3,276.0)
-
Tgal
|
$134,568
-
gal
|
$(-45,842.0) | |
06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $4,500 | $22,000 |
$4,121
57,241
kWh
|
$379
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $5,791 | $34,566 |
$3,756
52,162
kWh
|
$337
-
kW-mo/yr
|
$1,698
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $101,716 | $413,816 |
$12,000
166,672
kWh
|
$1,094
-
kW-mo/yr
|
$3,172
-
MMBtu
|
$(-3,276.0)
-
Tgal
|
$134,568
-
gal
|
$(-45,842.0) | ||
TOTAL IMPLEMENTED | $96,917 | $390,666 |
$7,603
105,598
kWh
|
$692
-
kW-mo/yr
|
$3,172
-
MMBtu
|
$(-3,276.0)
-
Tgal
|
$134,568
-
gal
|
$(-45,842.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs