ITAC Assessment: OR0314
ITAC logo
ITAC Assessment: OR0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Ship Repair
NAICS
n/a
SIC 3731: Ship Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 520,000
ft2
Annual Production 251,296
units
Production Hrs. Annual 8,317
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,777 4,432,298
kWh
Electricity Demand $18,332 11,172
kW-mo/yr
Electricity Fees $3,360 -
LPG $4,447 354
MMBtu
Fuel Oil #2 $16,190 2,465
MMBtu
Fuel Oil #6 $13,655 3,181
MMBtu
Other Energy $16,529 14,444
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7124: Make a practice of turning off lights when not needed $9,110 - $6,150
158,558
kWh
- - - $436 $2,524
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,164 $4,524 $2,477
63,892
kWh
$297
-
kW-mo/yr
- - $1,695 $695
03 2.4133: Use most efficient type of electric motors $2,150 $5,034 $1,943
50,117
kWh
$207
-
kW-mo/yr
- - - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,645 $500 - - - $1,645
-
MMBtu
- -
05 2.1331: Burn a less expensive grade of fuel $1,200 $10,000 - - $(-10,200.0)
-
MMBtu
$11,400
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,787 $2,000 $2,633
67,995
kWh
$154
-
kW-mo/yr
- - - -
07 2.3312: Install efficient rectifiers $1,220 $7,900 $1,040
26,671
kWh
$180
-
kW-mo/yr
- - - -
08 2.4224: Upgrade controls on compressors $4,685 $3,280 $4,435
114,302
kWh
$250
-
kW-mo/yr
- - - -
09 2.4239: Eliminate or reduce compressed air usage $9,562 $6,000 $9,038
233,294
kWh
$524
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $37,523 $39,238 $27,716
714,829
kWh
$1,612
-
kW-mo/yr
$(-10,200.0)
-
MMBtu
$13,045
-
MMBtu
$2,131 $3,219
TOTAL IMPLEMENTED $25,541 $15,338 $17,638
454,864
kWh
$908
-
kW-mo/yr
- $1,645
-
MMBtu
$2,131 $3,219
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs