Assessment Year | 1998 |
---|---|
Principal Product | Ship Repair |
NAICS |
n/a
|
SIC | 3731: Ship Building and Repairing |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
520,000
ft2
|
Annual Production | 251,296
units
|
Production Hrs. Annual | 8,317
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $171,777 | 4,432,298 |
kWh
|
$0.039 |
Electricity Demand | $18,332 | 11,172 |
kW-mo/yr
|
$1.64 |
Electricity Fees | $3,360 | - |
|
- |
LPG | $4,447 | 354 |
MMBtu
|
$12.56 |
Fuel Oil #2 | $16,190 | 2,465 |
MMBtu
|
$6.57 |
Fuel Oil #6 | $13,655 | 3,181 |
MMBtu
|
$4.29 |
Other Energy | $16,529 | 14,444 |
MMBtu
|
$1.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,523 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,541 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $9,110 | - |
$6,150
158,558
kWh
|
- | - | - | $436 | $2,524 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,164 | $4,524 |
$2,477
63,892
kWh
|
$297
-
kW-mo/yr
|
- | - | $1,695 | $695 | |
03 | 2.4133: Use most efficient type of electric motors | $2,150 | $5,034 |
$1,943
50,117
kWh
|
$207
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,645 | $500 | - | - | - |
$1,645
-
MMBtu
|
- | - | |
05 | 2.1331: Burn a less expensive grade of fuel | $1,200 | $10,000 | - | - |
$(-10,200.0)
-
MMBtu
|
$11,400
-
MMBtu
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,787 | $2,000 |
$2,633
67,995
kWh
|
$154
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.3312: Install efficient rectifiers | $1,220 | $7,900 |
$1,040
26,671
kWh
|
$180
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4224: Upgrade controls on compressors | $4,685 | $3,280 |
$4,435
114,302
kWh
|
$250
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.4239: Eliminate or reduce compressed air usage | $9,562 | $6,000 |
$9,038
233,294
kWh
|
$524
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $37,523 | $39,238 |
$27,716
714,829
kWh
|
$1,612
-
kW-mo/yr
|
$(-10,200.0)
-
MMBtu
|
$13,045
-
MMBtu
|
$2,131 | $3,219 | ||
TOTAL IMPLEMENTED | $25,541 | $15,338 |
$17,638
454,864
kWh
|
$908
-
kW-mo/yr
|
- |
$1,645
-
MMBtu
|
$2,131 | $3,219 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs