266
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0550 #04 Y:2023 | 04 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $299 | $1,150 | |
| LE0550 #03 Y:2023 | 03 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $1,539 | $3,500 | |
| LE0550 #02 Y:2023 | 02 | 2023 | Re-use or recycle hot or cold process exhaust air | $1,474 | $2,500 | |
| LE0550 #01 Y:2023 | 01 | 2023 | Reduce the pressure of compressed air to the minimum required | $2,663 | $100 | |
| UU0193 #06 Y:2021 | 06 | 2021 | Install occupancy sensors | $946 | $3,500 | |
| UU0193 #05 Y:2021 | 05 | 2021 | Reduce the pressure of compressed air to the minimum required | $1,875 | $5,000 | |
| UU0193 #04 Y:2021 | 04 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,736 | $1,307 | |
| UU0193 #03 Y:2021 | 03 | 2021 | Utilize higher efficiency lamps and/or ballasts | $2,764 | $4,720 | |
| UU0193 #02 Y:2021 | 02 | 2021 | Reschedule plant operations or reduce load to avoid peaks | $371,933 | $40,000 | |
| UU0193 #01 Y:2021 | 01 | 2021 | Use solar heat to make electricty | $269,225 | $7,636,800 | |
| TT0238 #08 Y:2020 | 08 | 2020 | Turn off equipment when not in use | $511 | $40 | |
| TT0238 #07 Y:2020 | 07 | 2020 | Install / repair insulation on steam lines | $1,527 | $350 | |
| TT0238 #06 Y:2020 | 06 | 2020 | Use optimum size and capacity equipment | $6,836 | $1,500 | |
| TT0238 #05 Y:2020 | 05 | 2020 | Increase efficiency of trucks | $7,291 | $24,565 | |
| TT0238 #04 Y:2020 | 04 | 2020 | Utilize energy-efficient belts and other improved mechanisms | $10,965 | $22,780 | |
| TT0238 #03 Y:2020 | 03 | 2020 | Use adjustable frequency drive or multiple speed motors on existing system | $13,222 | $25,000 | |
| TT0238 #02 Y:2020 | 02 | 2020 | Utilize higher efficiency lamps and/or ballasts | $19,091 | $75,890 | |
| TT0238 #01 Y:2020 | 01 | 2020 | Reduce combustion air flow to optimum | $28,385 | $3,500 | |
| OR0730 #05 Y:2019 | 05 | 2019 | Utilize higher efficiency lamps and/or ballasts | $1,030 | $2,058 | |
| OR0730 #04 Y:2019 | 04 | 2019 | Optimize plant power factor | $2,657 | $9,364 |