The Assessment Recommendation Codes ARC is the ITAC system for classifying recommendation types.
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
See the Assessment Recommendation Codes ARC Manual for additional details.
|
TOP
|
ARC | Description | Recommendations Rec's | Recommended Rec'd $ Savings | Average Avg Payback PB | Implementation Imp Rate |
|---|---|---|---|---|---|---|
|
back
|
2.xxxx | 2.xxxx: ENERGY MANAGEMENT | 150k150,015 | $15k$14,686 avg | 1.9 yrs | 50.9% |
|
back
|
2.6xxx | 2.6xxx: Operations | 7.9k7,870 | $8.5k$8,482 avg | 0.7 yrs | 55.1% |
| selected | 2.62xx | 2.62xx: EQUIPMENT CONTROL | 7.2k7,227 | $8.7k$8,688 avg | 0.7 yrs | 54.0% |
|
open
|
2.621x | 2.621x: Equipment Use Reduction | 4.5k4,510 | $7.4k$7,436 avg | 0.6 yrs | 55.9% |
|
open
|
2.622x | 2.622x: Equipment Scheduling | 450450 | $19k$19,443 avg | 0.6 yrs | 61.7% |
|
open
|
2.623x | 2.623x: Equipment Automation | 2.1k2,067 | $8.0k$8,034 avg | 0.9 yrs | 48.7% |
|
open
|
2.624x | 2.624x: Load Reduction | 200200 | $19k$19,483 avg | 0.7 yrs | 48.9% |