| Assessment Year | 2026 |
|---|---|
| Principal Product | Closures |
| NAICS | 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive) |
| SIC | 3466: Crowns and Closures |
| Sales Range | $50 M to 100M |
| # of Employees | 130 |
| Plant Area |
305,000
ft2
|
| Annual Production | 726,066,000
units
|
| Production Hrs. Annual | 6,120
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $634,667 | 9,773,830 |
kWh
|
$0.065 |
| Electricity Demand | $69,018 | 17,068 |
kW-mo/yr
|
$4.04 |
| Electricity Fees | $69,640 | - |
|
- |
| Natural Gas | $496,240 | 148,269 |
MMBtu
|
$3.35 |
| TOTAL YEARLY COSTS | $1,269,565 | |||
| RECOMMENDED SAVINGS* | $203,205 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.1221: Replace obsolete burners with more efficient ones | $66,303 | $215,680 | - | - |
$66,303
-
MMBtu
|
- | |
| 02 | 2.1224: Replace boiler | $37,404 | $100,249 | - | - |
$27,470
-
MMBtu
|
$9,934 | |
| 03 | 2.4224: Upgrade controls on compressors | $21,890 | $7,775 |
$20,170
310,785
kWh
|
$1,720
-
kW-mo/yr
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $20,810 | $40,884 | - | - |
$20,810
-
MMBtu
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $17,593 | $10,740 |
$14,166
218,269
kWh
|
- |
$3,427
-
MMBtu
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $11,519 | $10,005 | - | - |
$11,519
-
MMBtu
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,691 | $720 |
$9,527
146,800
kWh
|
$1,164
-
kW-mo/yr
|
- | - | |
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,051 | $2,550 |
$5,051
77,823
kWh
|
- | - | - | |
| 09 | 2.4151: Develop a repair/replace policy | $5,243 | $10,920 |
$4,673
72,001
kWh
|
$570
-
kW-mo/yr
|
- | - | |
| 10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,525 | $12,610 |
$2,250
34,675
kWh
|
$275
-
kW-mo/yr
|
- | - | |
| 11 | 2.4239: Eliminate or reduce compressed air usage | $2,459 | $3,000 |
$2,459
37,889
kWh
|
- | - | - | |
| 12 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,403 | $3,600 |
$(-252.0)
(-3,888)
kWh
|
- |
$1,655
-
MMBtu
|
- | |
| 13 | 2.7135: Install occupancy sensors | $314 | $990 |
$237
3,658
kWh
|
$77
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $203,205 | $419,723 |
$58,281
898,012
kWh
|
$3,806
-
kW-mo/yr
|
$131,184
-
MMBtu
|
$9,934 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs