Assessment Year | 2018 |
---|---|
Principal Product | Concrete and Asphalt |
NAICS | 327320: Ready-Mix Concrete Manufacturing |
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
5,219,050
ft2
|
Annual Production | 200,000
ton
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $173,384 | 2,635,220 |
kWh
|
$0.066 |
Electricity Demand | $112,537 | 19,631 |
kW-mo/yr
|
$5.73 |
Natural Gas | $262,132 | 49,899 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | $548,053 | |||
RECOMMENDED SAVINGS* | $45,191 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,957 | $11,662 |
$6,765
102,499
kWh
|
$1,192
-
kW-mo/yr
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $481 | $380 |
$360
5,460
kWh
|
$120
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,068 | $280 |
$5,423
82,168
kWh
|
$645
-
kW-mo/yr
|
|
04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $977 | $350 |
$977
14,800
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,604 | $144 |
$1,859
28,116
kWh
|
$745
-
kW-mo/yr
|
|
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,334 | $1,920 |
$2,835
42,956
kWh
|
$499
-
kW-mo/yr
|
|
07 | 2.4112: Install soft-start to eliminate nuisance trips | $23,770 | $8,000 | - |
$23,770
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $45,191 | $22,736 |
$18,219
275,999
kWh
|
$26,972
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs