Assessment Year | 2025 |
---|---|
Principal Product | Steel studs, track & accessories |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $100 M to 500M |
# of Employees | 154 |
Plant Area |
362,000
ft2
|
Annual Production | 115,392,720
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $85,028 | 2,197,107 |
kWh
|
$0.039 |
Electricity Demand | $61,886 | 5,866 |
kW-mo/yr
|
$10.55 |
Electricity Fees | $27,077 | - |
|
- |
Natural Gas | $41,154 | 4,684 |
MMBtu
|
$8.79 |
TOTAL YEARLY COSTS | $215,145 | |||
RECOMMENDED SAVINGS* | $79,777 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $35,475 | $103,505 |
$19,977
380,968
kWh
|
$15,498
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,407 | $43,263 |
$15,220
393,272
kWh
|
$8,187
-
kW-mo/yr
|
- | |
03 | 2.4224: Upgrade controls on compressors | $4,889 | $2,661 |
$3,349
86,531
kWh
|
$1,540
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,884 | $791 |
$3,207
82,860
kWh
|
$1,677
-
kW-mo/yr
|
- | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $3,361 | $8,020 |
$2,665
68,855
kWh
|
$696
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,748 | $5,805 |
$1,631
42,134
kWh
|
$1,117
-
kW-mo/yr
|
- | |
07 | 2.4157: Establish a predictive maintenance program | $1,258 | $5,200 |
$1,869
48,293
kWh
|
$981
-
kW-mo/yr
|
$(-1,592.0) | |
08 | 2.6231: Utilize controls to operate equipment only when needed | $1,158 | $1,551 |
$768
19,843
kWh
|
$390
-
kW-mo/yr
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $988 | $3,325 |
$650
16,807
kWh
|
$338
-
kW-mo/yr
|
- | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $803 | $1,648 |
$529
13,678
kWh
|
$274
-
kW-mo/yr
|
- | |
11 | 2.4239: Eliminate or reduce compressed air usage | $499 | $1,904 |
$330
8,515
kWh
|
$169
-
kW-mo/yr
|
- | |
12 | 2.4231: Reduce the pressure of compressed air to the minimum required | $307 | $74 |
$201
5,193
kWh
|
$106
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $79,777 | $177,747 |
$50,396
1,166,949
kWh
|
$30,973
-
kW-mo/yr
|
$(-1,592.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs