ITAC Assessment: OK0562
ITAC logo
ITAC Assessment: OK0562
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Powdered metal parts
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $5
M
to 10
M
# of Employees 93
Plant Area 48,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,620 5,248,535
kWh
Electricity Demand $91,100 -
Electricity Fees $8,002 -
Natural Gas $27,693 4,544
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,717 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,604

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.1121: Use insulation in furnaces to facilitate heating / cooling $14,801 $1,936 $14,801
328,253
kWh
- - - -
02 2.4239: Eliminate or reduce compressed air usage $1,344 $1,516 $1,344
29,894
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $850 $110 $850
29,894
kWh
- - - -
04 2.7224: Reduce space conditioning during non-working hours $526 $242 $526
34,291
kWh
- - - -
05 2.7135: Install occupancy sensors $360 $532 $360
12,603
kWh
- - - -
06 2.8113: Purchase gas directly from a contract gas supplier $7,243 - - $7,243
-
MMBtu
- - -
07 4.513: Re-arrange equipment layout to reduce labor costs $7,200 $288 - - - - $7,200
08 3.5316: Contract a wood pallet recycling company $2,160 - - - - $2,160
-
lb
-
09 3.4155: Meter waste water $233 - - - $233
-
Tgal
- -
TOTAL RECOMMENDED $34,717 $4,624 $17,881
434,935
kWh
$7,243
-
MMBtu
$233
-
Tgal
$2,160
-
lb
$7,200
TOTAL IMPLEMENTED $25,604 $2,866 $16,011
370,750
kWh
- $233
-
Tgal
$2,160
-
lb
$7,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs