ITAC Assessment: UD0600
ITAC logo
ITAC Assessment: UD0600
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product plastic injection molded food containers
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 330
Plant Area 160,000
ft2
Annual Production 101,600
lb
Production Hrs. Annual 8,400
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $974,451 29,156,507
kWh
Electricity Demand $156,316 52,285
kW-mo/yr
LPG $12,766 3,929
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.625: Develop standard operating procedures $74,100 $16,000 - - - - - $74,100
02 3.5112: Reprocess spent oils on site for re-use $11,664 $4,200 - - $11,664
-
gal
- - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,810 - - $4,510
-
kW-mo/yr
- - $(-700.0) -
04 3.7212: Improved material handling (mixing and transfer) $3,780 $1,200 - - - $3,780
-
lb
- -
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,938 $7,000 $1,228
39,566
kWh
$710
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $95,292 $28,400 $1,228
39,566
kWh
$5,220
-
kW-mo/yr
$11,664
-
gal
$3,780
-
lb
$(-700.0) $74,100
TOTAL IMPLEMENTED $74,100 $16,000 - - - - - $74,100
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs