| Assessment Year | 2000 |
|---|---|
| Principal Product | plastic injection molded food containers |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 330 |
| Plant Area |
160,000
ft2
|
| Annual Production | 101,600
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $974,451 | 29,156,507 |
kWh
|
$0.033 |
| Electricity Demand | $156,316 | 52,285 |
kW-mo/yr
|
$2.99 |
| LPG | $12,766 | 3,929 |
MMBtu
|
$3.25 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $95,292 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $74,100 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.625: Develop standard operating procedures | $74,100 | $16,000 | - | - | - | - | - | $74,100 | |
| 02 | 3.5112: Reprocess spent oils on site for re-use | $11,664 | $4,200 | - | - |
$11,664
-
gal
|
- | - | - | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,810 | - | - |
$4,510
-
kW-mo/yr
|
- | - | $(-700.0) | - | |
| 04 | 3.7212: Improved material handling (mixing and transfer) | $3,780 | $1,200 | - | - | - |
$3,780
-
lb
|
- | - | |
| 05 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,938 | $7,000 |
$1,228
39,566
kWh
|
$710
-
kW-mo/yr
|
- | - | - | - | |
| TOTAL RECOMMENDED | $95,292 | $28,400 |
$1,228
39,566
kWh
|
$5,220
-
kW-mo/yr
|
$11,664
-
gal
|
$3,780
-
lb
|
$(-700.0) | $74,100 | ||
| TOTAL IMPLEMENTED | $74,100 | $16,000 | - | - | - | - | - | $74,100 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs