Assessment Year | 2024 |
---|---|
Principal Product | Vibrating (Shaker) Screens |
NAICS | 333131: Mining Machinery and Equipment Manufacturing |
SIC | 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 291 |
Plant Area |
274,491
ft2
|
Annual Production | 800,000
units
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $276,879 | 3,834,860 |
kWh
|
$0.072 |
Electricity Demand | $86,898 | 10,050 |
kW-mo/yr
|
$8.65 |
Natural Gas | $91,502 | 7,716 |
MMBtu
|
$11.86 |
TOTAL YEARLY COSTS | $455,279 | |||
RECOMMENDED SAVINGS* | $81,999 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $39,114 | $61,425 |
$30,642
424,040
kWh
|
$8,472
-
kW-mo/yr
|
- | - | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $15,802 | $77,610 |
$15,802
218,871
kWh
|
- | - | - | |
03 | 2.4322: Use or replace with energy efficient substitutes | $10,770 | $43,200 |
$8,434
116,813
kWh
|
$2,336
-
kW-mo/yr
|
- | - | |
04 | 2.4224: Upgrade controls on compressors | $8,001 | $13,171 |
$4,948
68,534
kWh
|
$3,053
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,506 | $770 |
$1,961
27,154
kWh
|
$545
-
kW-mo/yr
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,691 | $8,244 |
$1,172
16,232
kWh
|
$519
-
kW-mo/yr
|
- | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $1,211 | $1,154 |
$951
13,174
kWh
|
$260
-
kW-mo/yr
|
- | - | |
08 | 2.4151: Develop a repair/replace policy | $1,123 | $1,296 |
$1,230
17,034
kWh
|
$337
-
kW-mo/yr
|
- | $(-444.0) | |
09 | 2.2511: Insulate bare equipment | $878 | $581 | - | - |
$878
-
MMBtu
|
- | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $666 | $148 |
$519
7,188
kWh
|
$147
-
kW-mo/yr
|
- | - | |
11 | 2.1233: Analyze flue gas for proper air/fuel ratio | $237 | $1,029 | - | - |
$237
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $81,999 | $208,628 |
$65,659
909,040
kWh
|
$15,669
-
kW-mo/yr
|
$1,115
-
MMBtu
|
$(-444.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||