ITAC Assessment: WV0670
ITAC logo
ITAC Assessment: WV0670
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Vibrating (Shaker) Screens
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 291
Plant Area 274,491
ft2
Annual Production 800,000
units
Production Hrs. Annual 5,200
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,879 3,834,860
kWh
Electricity Demand $86,898 10,050
kW-mo/yr
Natural Gas $91,502 7,716
MMBtu
TOTAL YEARLY COSTS $455,279
RECOMMENDED SAVINGS* $81,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $39,114 $61,425 $30,642
424,040
kWh
$8,472
-
kW-mo/yr
- -
02 2.7241: Install outside air damper / economizer on hvac unit $15,802 $77,610 $15,802
218,871
kWh
- - -
03 2.4322: Use or replace with energy efficient substitutes $10,770 $43,200 $8,434
116,813
kWh
$2,336
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $8,001 $13,171 $4,948
68,534
kWh
$3,053
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,506 $770 $1,961
27,154
kWh
$545
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,691 $8,244 $1,172
16,232
kWh
$519
-
kW-mo/yr
- -
07 2.4239: Eliminate or reduce compressed air usage $1,211 $1,154 $951
13,174
kWh
$260
-
kW-mo/yr
- -
08 2.4151: Develop a repair/replace policy $1,123 $1,296 $1,230
17,034
kWh
$337
-
kW-mo/yr
- $(-444.0)
09 2.2511: Insulate bare equipment $878 $581 - - $878
-
MMBtu
-
10 2.4231: Reduce the pressure of compressed air to the minimum required $666 $148 $519
7,188
kWh
$147
-
kW-mo/yr
- -
11 2.1233: Analyze flue gas for proper air/fuel ratio $237 $1,029 - - $237
-
MMBtu
-
TOTAL RECOMMENDED $81,999 $208,628 $65,659
909,040
kWh
$15,669
-
kW-mo/yr
$1,115
-
MMBtu
$(-444.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs