ITAC Assessment: WV0654
ITAC logo
ITAC Assessment: WV0654
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Medium Duty Trucks
NAICS 336120: Heavy Duty Truck Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 300,000
ft2
Annual Production 15,000
units
Production Hrs. Annual 4,226
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,924 2,229,600
kWh
Electricity Demand $74,840 9,355
kW-mo/yr
Electricity Fees $241,420 -
Natural Gas $75,254 6,538
MMBtu
TOTAL YEARLY COSTS $536,438
RECOMMENDED SAVINGS* $41,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,481

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7224: Reduce space conditioning during non-working hours $12,942 $63,000 $1,685
25,920
kWh
- $11,257
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,126 $3,800 $4,526
69,632
kWh
$1,600
-
kW-mo/yr
- -
03 2.7314: Reduce ventilation air $5,594 $13,814 $518
7,969
kWh
- $5,076
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $5,126 $9,645 $(-2,160.0)
(-33,224)
kWh
- $7,286
-
MMBtu
-
05 2.4224: Upgrade controls on compressors $3,551 $9,700 $1,017
15,647
kWh
$2,534
-
kW-mo/yr
- -
06 2.2425: Use flue gases to heat process or service water $1,462 $5,940 - - $1,462
-
MMBtu
-
07 2.2628: Utilize a less expensive cooling method $1,242 $6,000 $1,066
16,407
kWh
$176
-
kW-mo/yr
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,093 $1,113 - - $1,093
-
MMBtu
-
09 2.1321: Replace fossil fuel equipment with electrical equipment $951 $330 $1,007
15,491
kWh
$(-56.0)
-
kW-mo/yr
- -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $648 $3,230 $480
7,384
kWh
$168
-
kW-mo/yr
- -
11 2.5195: Change product design to reduce energy requirements $612 $1,300 $452
6,949
kWh
$160
-
kW-mo/yr
- -
12 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $554 $150 $410
6,305
kWh
$144
-
kW-mo/yr
- -
13 2.4157: Establish a predictive maintenance program $493 $1,500 $1,011
15,555
kWh
$352
-
kW-mo/yr
- $(-870.0)
14 2.4151: Develop a repair/replace policy $282 $1,370 $474
7,291
kWh
$168
-
kW-mo/yr
- $(-360.0)
15 2.4221: Install compressor air intakes in coolest locations $226 $970 $167
2,562
kWh
- $59
-
MMBtu
-
16 2.2511: Insulate bare equipment $190 $98 $38
588
kWh
$14
-
kW-mo/yr
$138
-
MMBtu
-
17 2.4231: Reduce the pressure of compressed air to the minimum required $176 $240 $128
1,971
kWh
$48
-
kW-mo/yr
- -
TOTAL RECOMMENDED $41,268 $122,200 $10,819
166,447
kWh
$5,308
-
kW-mo/yr
$26,371
-
MMBtu
$(-1,230.0)
TOTAL IMPLEMENTED $19,481 $36,846 $6,990
107,556
kWh
$5,204
-
kW-mo/yr
$8,517
-
MMBtu
$(-1,230.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs