ITAC Assessment: WV0650
ITAC logo
ITAC Assessment: WV0650
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Polymer Resins
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $5
M
to 10
M
# of Employees 78
Plant Area 350,000
ft2
Annual Production 30,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,796 7,144,320
kWh
Electricity Demand $292,415 19,847
kW-mo/yr
Electricity Fees $37,026 -
LPG $37,774 1,270
MMBtu
TOTAL YEARLY COSTS $768,011
RECOMMENDED SAVINGS* $104,962 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,789

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $38,505 $113,760 $17,780
316,934
kWh
$20,725
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $16,578 $21,335 $11,879
211,748
kWh
$4,699
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $10,058 $35,930 $6,685
119,159
kWh
$3,373
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $9,350 $15,114 $6,213
110,752
kWh
$3,137
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,595 $891 $5,826
97,756
kWh
$2,769
-
kW-mo/yr
- -
06 2.4322: Use or replace with energy efficient substitutes $8,134 $21,176 $8,134
144,984
kWh
- - -
07 2.4157: Establish a predictive maintenance program $7,598 $1,500 $6,337
112,952
kWh
$3,196
-
kW-mo/yr
- $(-1,935.0)
08 2.4151: Develop a repair/replace policy $4,052 $8,935 $2,970
52,946
kWh
$1,502
-
kW-mo/yr
$(-420.0) -
09 2.6231: Utilize controls to operate equipment only when needed $1,956 $2,040 $1,956
34,870
kWh
- - -
10 2.4239: Eliminate or reduce compressed air usage $136 $388 $92
1,544
kWh
$44
-
kW-mo/yr
- -
TOTAL RECOMMENDED $104,962 $221,069 $67,872
1,203,645
kWh
$39,445
-
kW-mo/yr
$(-420.0) $(-1,935.0)
TOTAL IMPLEMENTED $39,789 $62,758 $28,123
495,109
kWh
$14,021
-
kW-mo/yr
$(-420.0) $(-1,935.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs