ITAC Assessment: WV0649
ITAC logo
ITAC Assessment: WV0649
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Automotive Parts
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 243
Plant Area 220,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $695,398 9,888,765
kWh
Electricity Demand $289,533 17,201
kW-mo/yr
Electricity Fees $1,200 -
Natural Gas $501,299 88,908
MMBtu
Waste Disposal Costs
Water Usage $107,165 11,489
Tgal
TOTAL YEARLY COSTS $1,594,595
RECOMMENDED SAVINGS* $96,108 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $51,171

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $19,114 $9,160 - - $19,114
-
MMBtu
-
02 2.2442: Preheat combustion air with waste heat $13,485 $18,440 - - $13,485
-
MMBtu
-
03 2.4224: Upgrade controls on compressors $10,514 $13,660 $2,099
29,862
kWh
$8,415
-
kW-mo/yr
- -
04 2.2426: Use waste heat from flue gases to heat space conditioning air $10,248 $20,166 - - $12,312
-
MMBtu
$(-2,064.0)
05 2.4157: Establish a predictive maintenance program $9,620 $1,500 $8,287
117,874
kWh
$2,710
-
kW-mo/yr
- $(-1,377.0)
06 2.6231: Utilize controls to operate equipment only when needed $9,203 $4,464 $9,203
130,915
kWh
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $6,255 $3,000 - - $6,339
-
MMBtu
$(-84.0)
08 2.4151: Develop a repair/replace policy $6,156 $1,439 $4,666
66,377
kWh
$1,532
-
kW-mo/yr
- $(-42.0)
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,697 $13,390 $3,536
50,294
kWh
$1,161
-
kW-mo/yr
- -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,665 $407 $2,756
39,210
kWh
$909
-
kW-mo/yr
- -
11 2.4231: Reduce the pressure of compressed air to the minimum required $1,381 $528 $1,044
14,849
kWh
$337
-
kW-mo/yr
- -
12 2.4239: Eliminate or reduce compressed air usage $747 $2,233 $562
8,000
kWh
$185
-
kW-mo/yr
- -
13 2.6241: Reduce temperature of process equipment when on standby $740 $2,930 $740
10,530
kWh
- - -
14 2.7135: Install occupancy sensors $283 $608 $132
1,871
kWh
$151
-
kW-mo/yr
- -
TOTAL RECOMMENDED $96,108 $91,925 $33,025
469,782
kWh
$15,400
-
kW-mo/yr
$51,250
-
MMBtu
$(-3,567.0)
TOTAL IMPLEMENTED $51,171 $30,032 $20,421
290,475
kWh
$6,800
-
kW-mo/yr
$25,453
-
MMBtu
$(-1,503.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs