| Assessment Year | 2001 |
|---|---|
| Principal Product | Aircraft Engine Internal Component Repair |
| NAICS |
n/a
|
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $10 M to 50M |
| # of Employees | 235 |
| Plant Area |
65,000
ft2
|
| Annual Production | 150,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $209,624 | 8,487,400 |
kWh
|
$0.025 |
| Electricity Demand | $216,758 | 37,160 |
kW-mo/yr
|
$5.83 |
| Electricity Fees | $240 | - |
|
- |
| Natural Gas | $39,583 | 8,077 |
MMBtu
|
$4.90 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,094 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,794 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $147 | $126 | - | - |
$147
-
MMBtu
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,500 | $360 |
$3,500
141,828
kWh
|
- | - | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $7,000 | $13,300 |
$5,550
225,304
kWh
|
$1,450
-
kW-mo/yr
|
- | - | |
| 04 | 4.426: Modify workload | $147 | $70 |
$55
2,246
kWh
|
$36
-
kW-mo/yr
|
- | $56 | |
| 05 | 2.7226: Use computer programs to optimize hvac performance | $2,100 | $5,800 | - |
$2,100
-
kW-mo/yr
|
- | - | |
| 06 | 2.7131: Add area lighting switches | $1,000 | $290 |
$1,000
35,040
kWh
|
- | - | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $6,200 | $5,734 |
$1,100
50,600
kWh
|
- |
$5,100
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $20,094 | $25,680 |
$11,205
455,018
kWh
|
$3,586
-
kW-mo/yr
|
$5,247
-
MMBtu
|
$56 | ||
| TOTAL IMPLEMENTED | $11,794 | $14,146 |
$10,105
404,418
kWh
|
$1,486
-
kW-mo/yr
|
$147
-
MMBtu
|
$56 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs