ITAC Assessment: OK0611
ITAC logo
ITAC Assessment: OK0611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aircraft Engine Internal Component Repair
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 235
Plant Area 65,000
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,624 8,487,400
kWh
Electricity Demand $216,758 37,160
kW-mo/yr
Electricity Fees $240 -
Natural Gas $39,583 8,077
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,794

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.6218: Turn off equipment when not in use $147 $126 - - $147
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,500 $360 $3,500
141,828
kWh
- - -
03 2.4133: Use most efficient type of electric motors $7,000 $13,300 $5,550
225,304
kWh
$1,450
-
kW-mo/yr
- -
04 4.426: Modify workload $147 $70 $55
2,246
kWh
$36
-
kW-mo/yr
- $56
05 2.7226: Use computer programs to optimize hvac performance $2,100 $5,800 - $2,100
-
kW-mo/yr
- -
06 2.7131: Add area lighting switches $1,000 $290 $1,000
35,040
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $6,200 $5,734 $1,100
50,600
kWh
- $5,100
-
MMBtu
-
TOTAL RECOMMENDED $20,094 $25,680 $11,205
455,018
kWh
$3,586
-
kW-mo/yr
$5,247
-
MMBtu
$56
TOTAL IMPLEMENTED $11,794 $14,146 $10,105
404,418
kWh
$1,486
-
kW-mo/yr
$147
-
MMBtu
$56
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs