Assessment Year | 2023 |
---|---|
Principal Product | Green Hardwood Lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $5 M to 10M |
# of Employees | 28 |
Plant Area |
15,957
ft2
|
Annual Production | 15,957
units
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,514 | 879,496 |
kWh
|
$0.056 |
Electricity Demand | $63,522 | 4,307 |
kW-mo/yr
|
$14.75 |
Electricity Fees | $10,594 | - |
|
- |
TOTAL YEARLY COSTS | $123,630 | |||
RECOMMENDED SAVINGS* | $33,272 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,744 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $15,045 | $75,000 | - |
$15,045
-
kW-mo/yr
|
- | - | |
02 | 2.3212: Optimize plant power factor | $5,278 | $7,699 | - | - | $5,278 | - | |
03 | 2.4224: Upgrade controls on compressors | $2,796 | $1,931 |
$1,218
21,634
kWh
|
$1,578
-
kW-mo/yr
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,218 | $3,090 |
$920
16,335
kWh
|
$1,298
-
kW-mo/yr
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $1,542 | $7,652 |
$642
11,406
kWh
|
$900
-
kW-mo/yr
|
- | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $1,494 | $566 |
$624
11,075
kWh
|
$870
-
kW-mo/yr
|
- | - | |
07 | 2.4157: Establish a predictive maintenance program | $1,285 | $1,500 |
$821
14,582
kWh
|
$1,151
-
kW-mo/yr
|
- | $(-687.0) | |
08 | 2.4157: Establish a predictive maintenance program | $1,085 | $1,500 |
$739
13,124
kWh
|
$1,033
-
kW-mo/yr
|
- | $(-687.0) | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $997 | $3,526 |
$416
7,383
kWh
|
$581
-
kW-mo/yr
|
- | - | |
10 | 2.6231: Utilize controls to operate equipment only when needed | $798 | $127 |
$798
14,171
kWh
|
- | - | - | |
11 | 2.4151: Develop a repair/replace policy | $611 | $1,094 |
$277
4,921
kWh
|
$384
-
kW-mo/yr
|
- | $(-50.0) | |
12 | 2.4239: Eliminate or reduce compressed air usage | $123 | $219 |
$49
878
kWh
|
$74
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $33,272 | $103,904 |
$6,504
115,509
kWh
|
$22,914
-
kW-mo/yr
|
$5,278 | $(-1,424.0) | ||
TOTAL IMPLEMENTED | $8,744 | $18,053 |
$4,211
74,783
kWh
|
$5,907
-
kW-mo/yr
|
- | $(-1,374.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs